Analytical Technology A15 Specifikace Strana 9

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 41
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 8
ATI A15/66 Residual Sulfite Monitor
6
O&M Manual
Rev-W (8/10)
INSTALLATION
The main installation requirements of ATI's sulfite monitor are mechanical installation, connection
of power to the electronics, connection of sample and drain lines to the constant head flowcell, and
connection of reagents to the reagent pump.
Figure 2 provides details on the mechanical installation of the standard panel mounted electronic
monitor. Dimensions on the panel cutout are included, and the panel cutout must be made accurately as
the cutout tolerance is small. Panel mounting brackets are included with the monitor and are attached as
shown in Figure 2.
Figure 2 - Panel Mount Dim. & Installation
Zobrazit stránku 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 40 41

Komentáře k této Příručce

Žádné komentáře